St. John's Forest Kitchen
St. John's Forest Kitchen
Location
- St. John’s Forest
Budget
- $105,000
Type
- Kitchen remodel
Timeline
- Approximately 1.5 months
Features
- Custom hood with high-powered ventilation (approx. 1,200 CFM)
- Return air system installed to balance airflow due to hood power
- Relocated built-in coffee / cappuccino machine
- Tile “rug” inlay cut into the kitchen floor where the island was removed
- Island removed to improve layout and flow
- Tile flooring matched to kitchen perimeter
- Layout largely stayed the same, with targeted functional upgrades
- Custom cabinetry details including double-stacked cabinets
- Focus on both design and mechanical performance
- Kitchen included a built in coffee bar /cappuccino machine